Trump grants permit for Enbridge Line 5 pipeline crossing at St. Clair River

by AndyParrish
0 comments
Laina G. Stebbins

Laina G. Stebbins

The Trump administration on Wednesday issued a presidential permit for Enbridge’s Line 5 pipeline crossing at the St. Clair River, renewing federal authorization for the decades-old infrastructure as part of a broader push to bolster cross-border oil transport.

The permit replaces a 1991 authorization for the Michigan crossing near Marysville in St. Clair County and allows the Canadian company to continue operating and maintaining the existing pipeline facilities at the international boundary. It applies only to the St. Clair River border crossing and does not apply to Enbridge’s separate proposal to build a tunnel beneath the Straits of Mackinac, which remains under review by state and federal regulators.

Similar permits issued the same day by Trump also cover several Enbridge pipeline operations in North Dakota, part of a wider effort to streamline energy infrastructure between the U.S. and Canada.

In the White House order, the administration said the permit authorizes the transport of crude oil and petroleum products across the border and requires the company to comply with all applicable federal, state and local regulations. It also mandates that the pipeline be maintained in “good repair” and holds the company responsible for environmental damages tied to its operation.

Sean McBrearty, coordinator for the environmental advocacy group Oil & Water Don’t Mix, said the move benefits Enbridge without addressing consumer costs or environmental risks. 

“Calling this ‘energy relief’ is a smokescreen. This permit won’t lower prices by a single cent. It’s a subsidy for Enbridge and paid for with continued Great Lakes risk,” McBrearty said.

Enbridge, meanwhile, welcomed the permit authorization.

“This important action enables Enbridge’s existing cross-border pipeline network, moving more than 3 million barrels a day, to continue safely and reliably delivering the energy that is foundational to both U.S. and Canadian economic competitiveness and security,” Enbridge spokesperson Ryan Duffy said.  

The Line 5 pipeline, built in 1953, stretches from northwestern Wisconsin through Michigan into Sarnia, Ontario, carrying 540,000 barrels of light crude oil, light synthetic crude and natural gas liquids a day.

The permit comes as legal disputes continue over Michigan’s attempt to shut down the pipeline and as tribal nations press treaty-based claims against the project.

McBrearty argues the administration’s action is part of a broader strategy to expand fossil fuel infrastructure.

“This is a political decision, not an energy solution,” McBrearty said. “Trump’s pipeline won’t lower gas prices. It won’t protect the Great Lakes. It will pad Enbridge’s bottom line and leave Michigan holding the risk.”

This story was originally produced by Michigan Advance, which is part of States Newsroom, a nonprofit news network which includes Wisconsin Examiner, and is supported by grants and a coalition of donors as a 501c(3) public charity.

You may also like

Leave a Comment

Show/Hide Player
-
00:00
00:00
Update Required Flash plugin
-
00:00
00:00